The Eurasian Development Bank (EDB) has officially allocated funding to conduct a detailed feasibility study for the proposed railway network connecting key areas around Issyk-Kul Lake in Kyrgyzstan. The project aims to enhance regional connectivity, boost tourism, and support economic growth by improving transport links in this strategically important region. The feasibility study will evaluate technical, environmental, and financial aspects, ensuring that the infrastructure aligns with sustainable development goals and benefits local communities.

Key objectives of the study include:

  • Assessing the optimal route that minimizes ecological impact while maximizing accessibility
  • Identifying potential economic benefits such as increased trade and job creation
  • Evaluating estimated costs and funding mechanisms to guarantee project viability
  • Analyzing integration with existing transport networks within Kyrgyzstan and neighboring countries
Parameter Details
Project Location Issyk-Kul Lake Region, Kyrgyzstan
EDB Funding Amount $3.5 million (approx.)
Study Duration 12 months
Main Focus Environmental & Economic Viability